Drawing-to-order workspace
PROJECT SETUP

Turn plans into an installation-ready order.

Upload a mechanical drawing, define the pipe markers, valve tags, and equipment labels, and place numbered callouts where the field should install them. Aboveground pipe marker locations use ASME A13.1-2023 as a reference; confirm the approved project edition and field conditions.

1. Upload drawing2. Specify items3. Place callouts4. Share field PDF

Project files are stored under private access links. Links are not password protected. Do not upload plans you are not permitted to share. How drawings are handled.